Importan Factors
when planning a Wind Farm
 

Site Location

Description of location
The location under consideration should first of all be wind - intensive during the whole year.
Usually this is guaranteed on coastal sites, on open land without forests or high hills within a range of about 15 km and, of course, on hill tops. Buildings, particulary housing, should not be nearer than 2 km to the windfarm.
Please provide details of your proposed site:

Wind intensity
The average wind intensity per annum should be around 6.0 m/s (at hubheight), or better.
If wind intensity inforination is not available throughout the year, we are prepared to arrange Ar the necessary measurement, based on your order. Please provide details:

Required site area
For a windfarm of 20 turbines, an area of about 1.0 km2 is needed.

Grid connection
Overhead, or buried cables, over a great distance, are an expensive undertaking. Please check and advise the distance to the nearest electricity connection point (power or sub-station):

The Electricity Corporation, your future customer
Before you begin detailed planning, contact the local Electricity Supply Corporation (EC) and find out whether they are willing to buy your generated power. If the answer is in the affirmative, ask whether the high tension cable connection point (power or sub-station) is able to carry the estimated input, for example 750 kW per turbine. If this is not the case, you will have to negotiate the cost of upgrading with the EC. Please provide details:

Infrastructure
It is necessary to consider that heavy loads have to be moved to the proposed windfarm area. The road access must be prepared to carry an axle load of approximately 12 tonnes. Please provide details:

Your name:
Company:
Adress:    
Zip:
City:
Country:
Phone:
Fax:
E-Mail:
URL:

 

RetexoGruppe - RISP GmbH
Altenburger Straße 31    D-04617 Rositz/Thuringan
Tel.: +49-(0)-34498/4660-0    Fax: +49-(0)-34498/46611
eMail: risp@retexo.de