Importan Factors
when planning a Wind Farm
 

Preamble

It is increasingly obvious that our conventional resources for generating electrical power are diminishing and are becoming too valuable to be burnt.

Wherever possible, alternative power sources should be used. An example of this is the use of Wind Farm.

RISP GmbH seeks to ensure that the most modern turbine generator technology, usually of a capacity of 600/750 kW or even above 1.0 MW per turbine, is manufactured and installed by its expert partners.

Many years of experience have provided the knowledge to ensure that very economical results are possible.

However, this does not only depend upon the most modern technology and high quality standards alone, the right location, where the wind turbines are to be erected, is very important, too.

If a windfarm is being planned, we can offer our advice and support to facilitate your planning, subject to receipt of the following information:

 

RetexoGruppe - RISP GmbH
Altenburger Straße 31    D-04617 Rositz/Thuringan
Tel.: +49-(0)-34498/4660-0    Fax: +49-(0)-34498/46611
eMail: risp@retexo.de